GOJI / ENGINEERING

Install, commission and maintain a goji processing line

Plan installation access, documented commissioning and maintenance around goji contact surfaces and interfaces.

Prepare the site before delivery

Check floor loading, clearances, transport openings, utility points and drainage against the approved layout. Confirm how screens, motors and major service parts can be removed after surrounding pipework is installed.

Commission in defined stages

Verify installation and instruments, demonstrate cleaning routes, then run representative material under the agreed process and acceptance plan. Keep dry checks, water checks and product trials as separate records; they prove different things.

Maintain what affects product handling

Build inspection tasks around belts, screens, rotors, seals, pumps, sensors and filling interfaces. Use the offered equipment documentation for intervals, spare parts and safe isolation rather than a generic calendar copied from another line.