GOJI PROCESSING / EQUIPMENT & CONNECTED LINES

Goji Berry Processing Lines
for Puree and Juice

Choose the equipment around your berries, your product and your pack. From integrated washing and pulp separation to treatment and aseptic bulk filling.

12Equipment families2Connected line routes1Clearly defined project scope
Connected goji pulp-processing equipment with stainless vessels and downstream treatment
Pulp processing, product transfer and downstream equipment
FROM BERRY TO BULK INGREDIENT
INSPECT & WASHSEPARATE & REFINETREAT & FILL
01 / YOUR STARTING POINT

A berry line.
Or a pulp module.

Buy a single machine, connect a complete berry route, or add treatment and filling to the pulp you already have.

01

Goji Puree and Juice Processing Line

Process fresh goji berries through washing, preparation and pulp separation, then connect the chosen texture treatment and bulk filling route.

Starts with
Fresh berries at receiving; frozen or dried whole-fruit preparation is a separately assessed front-end configuration.
Equipment & configuration →
02 / CORE EQUIPMENT

The right machine.
For the right duty.

Explore all 12 equipment families →
03 / COMPARE BEFORE YOU CHOOSE

Different jobs.
Different equipment.

A pulper separates seeds and skins. A mill adjusts texture. A filler needs the right treatment interface. Start with the job you need to solve.

Integrated goji berry washing bath and inclined elevator
Air-agitated washing bath with elevated fruit discharge
04 / ENGINEERED TO CONNECT

A machine list is
only the beginning.

Discharge heights, pulp transfer, buffer inventory and filler readiness need to work together. Define utilities, cleaning circuits and maintenance access alongside the product route.

Explore line engineering →
05 / FOLLOW THE PRODUCT

Whole berries.
Separated pulp.
A defined finished pack.

Select optional stages against your product, rather than adding every machine to every line.

  1. 01

    Receive, inspect and wash

    Spread berries for manual inspection, then use the integrated bubble bath and elevator when immersion washing suits the batch.

  2. 02

    Prepare and separate

    Optional crushing prepares the feed for the combined pulper and finisher. Collect seed/skin reject separately and assess it alongside the product.

  3. 03

    Buffer and condition the pulp

    A buffer assembly stabilizes the downstream supply. Select colloid milling, high-pressure homogenization or deaeration only for an identified product need.

  4. 04

    Treat and pack

    Coordinate tubular product treatment with the bag filling and cleaning sequences. Optional evaporation adds a separate concentration duty.

06 / PRODUCT APPLICATIONS

What will
you produce?

Compare product routes →
MATERIAL & CAPACITY

Fresh fruit is not dry input.

Keep received berries, prepared feed, separated pulp and filled product as distinct capacity boundaries.

Specify your operating quantity →
A SIMPLE FIRST STEP

Tell us what you need.

A product target or a machine requirement is enough to begin. Add quantity and packaging if known; technical details can follow.

Discuss your equipment →
LET’S DISCUSS YOUR EQUIPMENT

Have a goji project in mind?

Tell us the machine, product or starting material. The details can follow.

Request a quotation