Recipe basis
Record dried-fruit mass before water addition. A hydrated batch weight cannot replace it.
Create a controlled feed from dried goji berries while keeping berries, water and drainage measurable.
A suitable vessel combines measured fruit loading, a metered water inlet, controlled mixing where needed, accessible discharge and collection of any removed soak liquid.
Record dried-fruit mass before water addition. A hydrated batch weight cannot replace it.
Specify whether soak liquid enters the product, is partly retained or is removed. Name the drainage method and interval.
Match loading, holding, discharge and cleaning to the downstream pulper schedule; nominal vessel volume is not hourly fruit capacity.
Water supply quality, load-cell arrangement, liquid collection, discharge head and the transfer pump are part of the package.
Provide access around the discharge and agitation surfaces; validate removal of skin and fibre residues after emptying.
Material · product · named capacity · packaging